11MayInvitation to submit a tender for the direct award of services entitled: "Event organization services within the framework of the INTERREG EUROPE 2021 – 2027 program, entitled: "Religious, Spirituals and Pilgrimage European Cultural Tourism & Sustainability" / Religious, Spiritual and Pilgrimage Paths of European Cultural Tourism & Sustainability" & acronym RESPECTS.
6NoahPublic consultation on the Strategic Environmental Impact Assessment (SEA) of the Regional Plan for Climate Change Adaptation (RPCA) of Eastern Macedonia & Thrace
10MayRegister of Medium-Sized Combustion Plants (MSCP) under the territorial jurisdiction of the Region of Eastern Macedonia - Thrace.
11NoahEnvironmental approval of the Regional Development Program of the Region of Eastern Macedonia and Thrace 2021-2025.
6Apr.Start of consultation on the Strategic Environmental Impact Assessment (SEA) of the Regional Development Program (RDP) of the Region of Eastern Macedonia and Thrace 2021-2025
27JanApproval of the Strategic Environmental Impact Study of the Regional Development Program 2021-2025 of the Region of Eastern Macedonia - Thrace by the Ministry of Environment and Energy
5NoahInvitation to participate in the transnational pilot action +RESILIENT LAB in Marseille, France within the framework of the +RESILIENT project
21Sep.Invitation to participate in the 5th transfer webinar within the framework of the +Resilient project
21Sep.Invitation to participate in the 4th transfer webinar within the framework of the +Resilient project
17Sep.Successful Organization of the 2nd Local Workshop with Entrepreneurs of the Transnational Daciat Project
10Sep.Invitation to participate in the 3th transfer webinar within the framework of the +Resilient project
24JunInvitation to participate in the 1th transfer webinar within the framework of the +Resilient project
5Apr.Watch LIVE – Press Conference to present the results of the Pilot Action of the Region of Eastern Macedonia and Thrace within the framework of the +RESILIENT project
22JanMEDIUM-SIZED COMBUSTION PLANT REGISTER (MSCP) - In accordance with Annex I of the Joint Ministerial Decree No. 6164/16-03-2018 (Government Gazette No. 1107B'/2018)
16Oct.Subsidy to Standard Environmental Commitments (SEC) of the existing project "Photovoltaic power station 99,75 KW" by KRACHTOPOULI ENERGY CO., in part of the no. 32 agricultural plot of Anadasos Kopteros of the Municipality of Iasmos, P.E. Rodopi of the Region of Eastern Macedonia-Thrace, within the zone SDOE-28 of (EPM) 1b
16Sep.Compliance with Standard Environmental Commitments of the project "Construction and operation of an ASPEE with an installed capacity of 6,00 MW with an integrated electricity storage device and the ability to store electricity absorbed from the network with a maximum injection capacity of 6,00 MW" at the "KOMPSATO" location of the Sostos Municipal District, Iasmos Municipality, Rodopi Region, Eastern Macedonia Thrace Region, of the company named KOMPSATOS SINGLE-PERSON IKE.
16Sep.Compliance with Standard Environmental Commitments of the project "Construction and operation of an ASPEE with an installed capacity of 6,00 MW with an integrated electricity storage device and the ability to store electricity absorbed from the network with a maximum injection capacity of 6,00 MW" at the "XEROKEFALOS" location of the Sostos Municipal District, Iasmos Municipality, Rodopi Region, Eastern Macedonia Thrace Region, of the company named SKALOPOULA SINGLE-PERSON IKE.
16Sep.Compliance with Standard Environmental Commitments of the project "Construction and operation of an ASPEE with an installed capacity of 6,00 MW with an integrated electricity storage device and the ability to store electricity absorbed from the network with a maximum injection capacity of 6,00 MW" at the location "XEROKEFALOS 2" of the Municipal District of Sostos, Municipality of Iasmos, Regional Unit of Rodopi, Region of Eastern Macedonia and Thrace, of the company named VELANIDIA 1 SINGLE-PERSON LIMITED LIABILITY COMPANY.
8Sep.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 50,00MW and a guaranteed (useful) capacity of 100,00MWh using storage batteries" at the location "Kakorema I", of the Municipal Authority of Sapes, of the Municipality of Maronia Sapes, of the Regional Unit of Rodopi, of the Region of East Macedonia and Thrace, with the Implementing Agency being "SMART BATTERY SOLUTIONS 7 MIKE".
8Sep.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station through accumulators, maximum injection power of 50,00MW and guaranteed (useful) capacity of 100,00MWh" at the location "Kakorema II", of the Public Utility of Sapes, Municipality of Maronia Sapes, Regional Unit of Rodopi, Region of East Macedonia and Thrace, with the Implementing Agency being "SMART BATTERY SOLUTIONS 8 MIKE"
8Sep.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 35,00MW and a guaranteed (useful) capacity of 140,00MWh using storage batteries" at the location "Voidolivado Nea Santa", at no. 562, parcel of land, Distribution 1930, Santa, of the Municipal District of Sapes, of the Municipality of Maroneia-Sapes, of the Regional Unit of Rodopi, of the Region of East Macedonia and Thrace, with the Implementing Agency being "PINDO WIND SINGLE-PERSON IKE".
5Sep.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 50,00MW and a guaranteed (useful) capacity of 100,00MWh using storage batteries" at the location "BOUSTANIA", at plot no. 615 of the farm of N. Santas of the Municipal District of Sapes of the Municipality of Maroneia-Sapes of the Regional Unit of Rodopi, of the Region of East Macedonia and Thrace with the Implementing Agency "QAIR HELLAS ENERGY SOLE AGENCY S.A.".
18Aug.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 40,00MW and a guaranteed (useful) capacity of 80,00MWh using storage batteries" at the location "THRYLORIO II", of the P.E. Fillyra of the Municipality of Arrianes, of the Regional Unit of Rodopi, of the Region of East Macedonia and Thrace with the Implementing Agency "Ch. ROKAS S.A.".
18Aug.Compliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 30,00MW and a guaranteed (useful) capacity of 60,00MWh using storage batteries" at the location "THRYLORIO I", of the P.E. Fillyra of the Municipality of Arrianes, of the Regional Unit of Rodopi, of the Region of East Macedonia and Thrace with the Implementing Agency "Ch. ROKAS S.A.E.".
24JulCompliance with Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 50,00MW and a guaranteed (useful) capacity of 200,00MWh using storage batteries" at the MONASTIRI location of the Municipal Unit of Fillyra, Municipality of Arrian, Regional Unit of Rodopi, Region of East Macedonia and Thrace with the Implementing Agency "HELLENIQ RENEWABLES M.A.E.".
16JulCompliance with Standard Environmental Commitments (SEC) of the project "Improvement of passability-asphalting of the municipal road network to Dokos Municipality of Arriona" of the Municipality of Arriona of the Rhodope Regional Unit of the Hellenic Ministry of Environment and Natural Resources.
15JulCompliance with Standard Environmental Commitments (SEC) of the project "Restoration of asphalt pavement in the P.C. of Archontikon, Municipality of Arriona" of the Municipal Authority of Fillyra, Municipality of Arriona, of the Regional Unit of Rodopi, of the Ministry of Environment and Natural Resources of the Hellenic Republic.
20JunFormation of Environmental Quality Control Teams (K.E.P.P.E.) of the Rhodopes Regional Administration
29MayFine imposed on GNANI STAVROS of Spyridon for violations of environmental legislation in accordance with Article 21 of Law 4014/11, as amended and in force
4MarPosting of the Final Audit Report on compliance with applicable environmental legislation for measuring noise emitted by a catering establishment in the city of Drama
9Dec.Start of normal operation of the new automatic meteorological station of the Department of Environment and Hydroeconomics of the Drama Regional Administration, in collaboration with meteo.gr / National Observatory of Athens and the Nikiforou High School with Lyceum Classes.
18NoahAction "OUR ENVIRONMENT - OUR LIFE" within the framework of the initiative "GIS DAY" - "World GIS (Geographic Information Systems) Day" / Department of Environment and Hydrology of the Regional Administration of Drama
3NoahCompliance with Standard Environmental Commitments of the project "Opening of a tractor road of length 0+549,79km in the area of TK. Graniti, MUNICIPALITY OF K. NEUROKOPI, PE DRAMAS, at the location: "Vasilikoko bovno", (Φ5984), of the company MARMI LTD"
22Oct.Posting of the Final Audit Report on compliance with the applicable environmental legislation for "Existence of unprocessed AEKKK materials during the process of shaping agricultural plots owned by Mr. Chatzinikolaides Ioannis"
6Oct.Posting of the Final Audit Report on compliance with applicable environmental legislation for the temporary storage of solid non-hazardous waste activity carried out by Kaimasidis Nikolaos
16JanCompliance with Standard Environmental Commitments of the project "UPGRADE OF THE RURAL ROAD OF FARM ESTATES OF PERICHORA - KALLITHEA - ANTHOCHORIO" in the farms of Perichora, Kallithea and Anthochori, in the Municipality of Prosotsani, in the Regional Unit of Drama
8JunProject scope: "Installation of a 999,79 KW photovoltaic power station and an electricity storage unit through 2 MW injection/absorption power accumulators and a guaranteed capacity of 4 MW on a plot of land using the "DC COUPLING BEHIND THE METER" method of the company "PETROS RAFTOPOULOS & CO. EE.", on a part of the plot of land no. 310 of the Tympanou farm, Topeiros Municipality, Xanthi Prefecture"
5MayInclusion in the PPD of the existing project: "Photovoltaic Plant with a capacity of 2,978 MWp, of the company "GENISEA S.A.", which exists at the location "SYDINI", on plots no. 135 and 136 with a total area of 163 acres, in the off-plan area of the Sydini farm, D.Avdira, P.E. Xanthi, P.A.M.Th.
29Apr.of the existing project: "Photovoltaic Plant with a capacity of 3,3 MW at the location of GIONA I, in the Municipality of AVDIRON, in the Prefectural Government of XANTHI, P.A.M. & Th., of the company SOL SUN LITOCHORO S.A."
21Apr.Project scope: Installation of an Electrical Energy Storage Station (EES) with a maximum injection/absorption capacity of 25 MW, guaranteed (useful) capacity of 96,288 MWh and installed capacity of 120,36 MWh, on part of parcels no. 136 and 137, on the Afxentiou – Katramiou farm, Municipality of Avdira, Prefectural Government of Xanthi, PA M.Th., of the company "TIERRA BESS II IKE"
21Apr.Subsumption to the P.P.D. of the project: Installation of an electricity storage station (SSS) with a maximum injection/absorption power of 25 MW, guaranteed (useful) capacity of 96,288 MWh and installed capacity of 120,36 MWh in part of plot no. 136 within the Afxentio-Katramio farm, within the Afxentio-Katramio land consolidation 1998-2003 Municipality of Avdira, Prefectural Government of Xanthi, PA M. Th.
9MarInclusion in the PPD of the existing project: "3 MW PV Power Station at the location of MANGANIOTIKA, of the Municipality of AVDIRON of the XANTHI REGION, PAMT, of the company SOL SUN LITOCHORO S.A." with PET number 2603009131.
5Feb.Subsumption of the project to the PPD: "Study of opening an agroforestry road in the settlement of Melivoia to Piges", of the Municipality of Myki, Prefectural Government of Xanthi, P. A. M.Th.
30JanInclusion in the PPD of the existing project: "Photovoltaic Power Plant (PPPP), capacity 3,073MW, at the location "KARYDIA", Municipality of Avdira, Prefectural Government of Xanthi, PAMT."
28JanInclusion in the PPD of the existing project: "Photovoltaic power generation station with a capacity of 2,35 MW at the location of ΄΄Avdira Ι΄΄, Municipal District of Avdira, Municipality of Avdira, Regional Municipality of Xanthi, P. A. M. Th."
19JanSubsumption to P. P. D. of the existing project: "P. S. power 3,5 MW", of the company "PRINCIPIA ENERGY GENERATION MON.A.E.", which exists at the location "PEZOULIOTIKA" on a plot of land with an area of 116.642,2 sq m, of the Municipality of Avdira, P. E. of Xanthi, P.A. M. Th.
15JanCompliance with Standard Environmental Commitments of the existing project: "Photovoltaic Plant with a capacity of 3,5 MW", of the company "PRINCIPIA ENERGY GENERATION MON.S.A.", which exists at the location "PEZOULIOTIKA" on a plot of land with an area of 116.642,2 sq m, in the Municipality of Avdira, Xanthi Prefecture, P A MTH
2JanCompliance with Standard Environmental Commitments of the existing project: "Photovoltaic power station with a capacity of 4 MW at the location of ΄΄CHOIRODASOS΄΄, Public Utility District of Avdira, Municipality of Avdira, Prefectural Municipality of Xanthi, Region of Eastern Macedonia - Thrace"
2JanCompliance with Standard Environmental Commitments of the existing project: "Photovoltaic power station with a capacity of 3,81 MW at the location ΄΄POLYSITOS Ι΄΄, Vistonidos Municipality, Municipality of Avdira, Xanthi Region, Eastern Macedonia - Thrace".
17MarAmendment of the Subsidy to Standard Environmental Commitments of the project "Electricity Storage Station with a maximum injection power of 8,875MW and a guaranteed (useful) capacity of 17,75MWh using storage batteries" at the location "Dokos I", of the Municipal Unit of Fillyra, Municipality of Arrianes, Regional Unit of Rodopi, Region of East Macedonia and Thrace due to modification of the technical characteristics of the equipment as referred to in the no. prot. 350728/6695/7-11-2024 PPD (ADA: 93ΔT7ΛΒ-ΨΒΨ) with the Implementing Agency "ENERGY TECHNICAL DEVELOPMENT COMPANY".
4Feb.Compliance with Standard Environmental Commitments of the project "Construction and operation of an Electrical Energy Storage Station with a system of electrochemical accumulators with a maximum injection/absorption power of 50MW and a guaranteed useful capacity of 100,00 MWh" within the OT. 34-39- 44 of the Komotini Industrial Area, the Rodopi Region of the Region of East Macedonia - Thrace with the Implementing Agency being ALFA WOOD GROUP AEBE
4Feb.Inclusion in the P.P.D. of the project "Temporary storage of scrap iron and metals (srap)" on a plot of land with an area of 3614,88 sq m on the Komotini farm in the Rodopi Regional Municipality of the Region of Eastern Macedonia and Thrace by Housseinoglou Georgios.
3Feb.Compliance with Standard Environmental Commitments of the project "Construction and operation of an Electrical Energy Storage Station with a system of electrochemical accumulators with a maximum injection/absorption power of 5,00MW and a guaranteed useful capacity of 10,00 MWh" in part of plot no. 218, area 3549,14sq.m., distribution 1930, Kallithea farm, Municipality of Maroneia Sapes, Regional Unit of Rhodope, Region of East Macedonia - Thrace, with SUN ENERGY GR 201 IKE as the Implementing Agency
9Oct.Compliance with Standard Environmental Commitments of the project Wind Power Plant with Installed Capacity of 3,45MW and Output Capacity of 2,99MW, at the location of "Drosini" in the Municipality of Arrianes, Regional Unit of Rodopi
6Feb.Approval of environmental conditions for the project Electrical Energy Storage Station with a nominal power of 6MWp using an Electrical Energy Storage Unit with lithium-ion batteries with a nominal capacity of 12Wh, on plot no. 282 in Agr.
25NoahCompliance with Standard Environmental Commitments of the activity: Storage and handling area for building materials, including handling of bulk materials (sand, gravel, etc.), at the Mandra farm, Municipality of Avdira, Regional Unit of Xanthi,
25NoahSubjection to Standard Environmental Commitments of the projects: a) "Storage facilities for solid non-hazardous waste (works R12, R13, D13, D15) other than those referred to in items 8, 9" b) "Storage facilities for separate streams of waste materials
30Apr.Inclusion in the PPA of the project "Individual Electrochemical Storage Station of Electrical Energy (battery) with a capacity of 10 MW on the plot number 2271, location "Spourgitolofos" of the farm Lepti, Municipality of Orestiada, Evros Region
11MarFINAL AUDIT REPORT Compliance with applicable environmental legislation by the company "Development Waste Management Company of Eastern Macedonia - Thrace - DIAAMATH S.A.E." for the Uncontrolled Waste Disposal Site (WDS), at the "Vrysi Katsika" location of the Didymoteicho Municipal Authority, Didymoteicho Municipality, Evros Region, Eastern Macedonia - Thrace Region
11MarFINAL AUDIT REPORT Compliance with the applicable environmental legislation by the Municipality of Didymoteicho for the Uncontrolled Waste Disposal Site (WDS), at the location "Vrysi Katsika" of the Didymoteicho Municipal Authority, Didymoteicho Municipality, Evros Regional Unit, Eastern Macedonia - Thrace Region
3Feb.Final Audit Report concerning the company "Development Waste Management Company of Eastern Macedonia - Thrace" with the distinctive title "DIAMATH SA", as legally represented, for the Uncontrolled Waste Disposal Site (HAD), at the location "Ypsomata" (or "Ambelia") of the Municipal District of Orestiada, Evros Prefecture
6Oct.Extension of validity of the sub-protocol no. P-438/26-6-2012 Decision on Approval of Environmental Conditions (AEPO) of the Department of Environment and Hydroeconomics of the Evros Regional Government for the Construction of the Irrigation Network of the Xiropotamos Reservoir on the Island of Samothrace
9Sep.Project scope: “50 MW/100 MWh solar power plant at the “Kounia 2” location in Feron, Municipality of Alexandroupolis, Evros Region”
9Sep.Project scope: “50 MW/100 MWh solar power plant at the “Kounia 1” location in Feron, Municipality of Alexandroupolis, Evros Region”
28JulInclusion in the PPD of the project "Individual Electrochemical Storage Station of Electrical Energy (battery) with a nominal power of 25 MW at A.T. 1527 of the Didymoteicho Farm, Didymoteicho Municipality, Evros Region"
28JulInclusion in the PPD of the project "Electricity Storage Station with a nominal capacity of 6 MW at A.T. 2070 of the Ellinochori Farm, Municipality of Didymoteicho, Evros Region"
28JulInclusion in the PPA of the project "Electricity Storage Station with a nominal capacity of 6 MW at A.T. 700 of the Rigi Farm, Municipality of Didymoteicho, Evros Region"
28JulInclusion in the PPA of the project "Individual Electrochemical Storage Station of Electrical Energy (battery) with a nominal power of 25 MW at the location "Lekani" A.T. 424 of the Neochori Farm, Municipality of Orestiada, Evros Region"
25JulElectricity storage unit with accumulators with a maximum injection power of 50 MW at A.T. 663, 665 of the Koilon farm of the Fera Municipality, Alexandroupolis Municipality, Evros Region
25JulInclusion in the PPA of the activity "Storage and management unit for solid non-hazardous waste" in Potamos, Alexandroupolis
25JulIsolated Electrochemical Energy Storage Station (battery) with a capacity of 98 MW on plot no. 800A of Neo Pyrgos, Orestiada Municipality, Evros Prefecture
24JulSubsidy to Standard Environmental Commitments and Additional Conditions to ensure the integrity of the protected area SPA of the Natura 2000 network with code GR1110002 and name "Dadia Forest - Soufli" from the project "Improvement of the accessibility of main rural roads at the Avgo-Agkathia location in the D.K. of Soufli, DE of Soufli, Municipality of Soufli" of the Evros Regional Authority
16JanEnvironmental approval of the Regional Climate Change Adaptation Plan (RCAP) of the Region of Eastern Macedonia - Thrace, following an evaluation of the Strategic Environmental Impact Assessment (SEIA) of the Plan.
6NoahPublic consultation on the Strategic Environmental Impact Assessment (SEA) of the Regional Plan for Climate Change Adaptation (RPCA) of Eastern Macedonia & Thrace
13Sep.Strategic Environmental Impact Assessment (SEA) of the Regional Plan for Climate Change Adaptation (RPCA) of the Region of Eastern Macedonia & Thrace
3Feb.Market research for vehicle cleaning services for up to nine (9) vehicles in the Drama Regional Government.
22Aug.Market research for the supply of spare parts for the vehicles and Project Machinery ME91238, KHY9449, KHY9509, ME137021, ME106421, ME102720, KHY9498, KHY9497 of the Drama Regional Administration
22Aug.Market research for the supply of spare parts for the vehicles KHY9561, KHY9453, KHY7233, KHY9432, KHY9433, KHY9449 of the Drama Regional Administration
7Aug.MARKET RESEARCH_SUPPLY OF SPARE PARTS FOR THE PROJECT MACHINES ME106421 AND ME91238 OF THE PREFACE OF DRAMA
21JulMarket research for the supply of spare parts for the Project Machine ME102720 of the Drama Regional Administration
27MayMARKET RESEARCH_MAINTENANCE AND DAMAGE REPAIR WORKS ON VEHICLES KYY9448 AND KYY9509 OF THE DRAMA PROVINCE
27MayMARKET RESEARCH_SUPPLY OF SPARE PARTS FOR THE VEHICLES KY9448 AND KY9509 OF THE PREFACE OF DRAMA
12MarMarket research for the supply of tires for the Project Machinery ME91238 and ME122158 of the Drama Regional Administration
12MarMarket research for tire repair of Project Machinery ME91238 and ME102720 of the Drama Regional Development Authority
12MarMarket research for the supply of tires for the vehicle ΚΥΥ9498 of the Drama Regional Administration
12MarMarket research for the supply of spare parts for the maintenance and proper operation of vehicles KHY9498 and KHY9453 of the Drama Regional Administration
12MarMarket research for work on vehicle ΚΗΥ9498 and Project Machine ΜΕ106421 of the Drama Regional Administration
27Oct.Change of date for electronic unsealing of tender offers for the project "Maintenance of asphalt pavements of sections of the old Amfipolis - Kavala national road from the borders of Serres Prefecture to Eleftheroupoli" with ESIDIS No. 215902
4Feb.Publication of contract details – Announcement of a draw for the formation of a tender committee for the project “Maintenance of the road network of the island of Thassos, Kavala Prefecture – Restoration of Safety & Passability”
29Dec.Publication of contract details - Announcement of a draw for the formation of a public contract tender committee for the project: “Asphalt works on the National road network under the jurisdiction of the Kavala Regional Administration”
24Dec.Publication of contract details - Announcement of a draw for the formation of a tender committee for the project "Improvement and modernization of the western intake and irrigation networks of the Western Nestos Plain"
15Dec.Publication of contract details – Announcement of a draw for the formation of a tender committee for the project: "Road maintenance works on sections of Nos. 6, 8, 10, 11, 12 and 13 of the Provincial Roads of Kavala Prefecture"
4NoahPublication of contract details - Announcement of a draw for the formation of a tender committee for the project "Maintenance of the road network of the Prefecture of Kavala - Restoration of Safety & Pedestrianity"
22Sep.Publication of contract details – Announcement of a draw for the formation of a tender committee for the project “Development of Tenagi Philippi – Cleaning of the Central Ditch (Phase IV)”
24JulPublication of contract details – announcement of a draw for the formation of a tender committee to select a contractor for the preparation of a study on “Marmaras Dam Irrigation Network”
2JulPublication of contract details – Announcement of a draw for the formation of a tender committee for the project: “ROAD INTERSECTIONS IN THE MUNICIPALITIES OF PANAGIA AND POTAMIAS, ISLAND OF THASOS”
6MayPublication of contract details – Announcement of a draw for the formation of a public works contract tender committee
13Feb.Publication of contract details – Announcement of a draw for the formation of a public works contract tender committee
15JanPublication of contract details – Announcement of a draw for the establishment, on an annual basis in 2020, of a public contract tender committee for Kavala Regional Development Projects
30MarInvitation to express interest, for the direct award of the supply of gravel, budget 37.200€ including VAT, which will be borne by the Public Company 02.02.0072.2410189001
30Sep.Announcement of the publication of an open electronic tender through ESID for the subproject "Upgrading the level of road safety of the network under the jurisdiction of the Xanthi Regional Municipality in its mountainous area", budget €6.100.000,00 (including VAT)
8JanINVITATION FOR NEGOTIATION WITHOUT PRIOR PUBLICATION FOR THE AWARD OF SERVICES OF TECHNICAL CONSULTANT – KEY DESIGNER FOR THE TECHNICAL SUB-PROJECT “Construction of Roundabouts at No. 9 Ep. Road (Mangana Intersection – Abdera Intersection)”
27Sep.Announcement of the publication of an open electronic tender through ESID, for the project entitled: "FIRE PROTECTION OF XANTHI ADMINISTRATION" with C.D.: 243601000 FUNDING: ANNUAL ACTION PROGRAM - TECHNICAL PROGRAM PAMT 2024 - XANTHI ADMINISTRATION - CAP
21MayAnnouncement of the publication of an open electronic tender via ESIDIS for the project entitled: "Construction of Roundabouts on No. 9 Ep. Road (Mangana Intersection – Avdira Intersection)" of the act "Construction of Roundabouts on No. 9 Ep. Road (Mangana Intersection – Kom
22MarAnnouncement of the publication of an open electronic tender through ESIDIS for the project "Restoration - Maintenance of the intake and central canals H and Z in the irrigation network of the TOEB Thalassia - Kremasti"
8MarAnnouncement of the publication of an open electronic tender through ESID, for the project entitled: "FLOOD PROTECTION OF THE EASTERN DYNAMIC OF THE NESTOS RIVER".
8MarAnnouncement of the publication of an open electronic tender through ESIDIS, for the project entitled: "EMERGENCY INTERVENTIONS AT THE SPHERER COMPLEX IN XANTHI" with C.D.: 243601000 FUNDING: ANNUAL ACTION PROGRAM - TECHNICAL PROGRAM OF PAMT 2
7MarAnnouncement of the publication of an open electronic tender via ESIDIS for the project "INSTALLATION OF A PHOTOVOLTAIC STATION IN THE XANTHI ADMINISTRATION BUILDING FOR THE APPLICATION OF ENERGY NET METERING"
5Dec.Announcement of the publication of an open electronic tender through ESIDIS, the general service entitled: "RENTAL OF PROJECT MACHINERY FOR CLEANING WORKS IN RIVERS AND STREAMS UNDER THE JURISDICTION OF THE PREfecture of XANTHI"
23Oct.Announcement of the publication of an open electronic tender for the study "STUDY OF RECONSTRUCTION OF INTERCHANGEABLE ROADS IN EP. O. 9 (MYRODATO-MANDRA)" funding: ANNUAL ACTION PROGRAM PAMTH 2023 CAP INVESTMENTS K.D. 233602019 budget 150.000,00 (with
25Aug.1. Announcement of the publication of an open electronic tender via ESIDIS for the project "REPAIR OF BRIDGES/TECHNICAL STRUCTURES OF N.O. 14 AND 55, FROM THE EXIT OF THE CITY OF XANTHI TO SMINTHI"
23Aug.Notification of modification of publication of an open electronic tender via ESIDIS for the project "MAINTENANCE OF ELECTRICAL INSTALLATIONS OF THE ROAD NETWORK OF THE XANTHI PROVINCE IN 2023-2024", funding: ANNUAL ACTION PROGRAM/TECHNICAL PROGRAM OF THE 2022 P.A.M.TH/
8Aug.Announcement of the publication of an open electronic tender through ESIDIS for the project "MAINTENANCE OF ELECTRICAL INSTALLATIONS OF THE ROAD NETWORK OF THE XANTHI PROVINCE IN 2023-2024", funding: ANNUAL ACTION PROGRAM/TECHNICAL PROGRAM OF THE 2022 P.A.M.TH/XANTHI PROVINCE/KAP INVESTS
22Dec.INVITATION FOR EXPRESSION OF INTEREST FOR THE TRANSPORTATION OF FOUR HUNDRED AND FIFTY TONNES 450 t. OF NON-MARKETABLE SALT TO THE PREfecture of XANTHI IN THE FRAMEWORK OF THE (SUB-PROJECT): “TRANSPORTATION OF NON-MARKETABLE SALT TO THE PREfecture of XANTHI IN 2020”
1Apr.The Technical Works Department of the Rodopi Regional Administration invites interested parties to submit written offers for the excavation of two (2) irrigation boreholes, within the area of the "Xirolimni" fish farm in Fanari, to protect fish from frost during the winter.
6JunAnnouncement of a market research for the repair of two (2) air conditioners at the Directorate of Technical Works of the Evros Regional Government on 1 I. Dragoumi Street in Alex/polis
6JunMarket research announcement for the provision of partial shading roller services/supply to the Directorate of Technical Works of the Evros Regional Administration on 1 I. Dragoumi Street in Alex/polis
17Sep.MARKET RESEARCH ANNOUNCEMENT FOR THE FULL MAINTENANCE, DISASSEMBLY & TECHNICALLY PROPER OPERATION OF THE VEHICLE KEI 4128 FOR MAINTENANCE – REPAIR OF THE DTE PE EVROS & ITS ACCESSORY EQUIPMENT
6Sep.MARKET RESEARCH ANNOUNCEMENT FOR THE FULL MAINTENANCE, DISASSEMBLY & TECHNICALLY PROPER OPERATION OF THE SIX (6) VEHICLES OF THE DTE PE EVROS & THEIR ACCESSORY EQUIPMENT TO BE MAINTENANCED - REPAIRED
6Sep.MARKET RESEARCH ANNOUNCEMENT FOR THE FULL MAINTENANCE, DISASSEMBLY & TECHNICALLY PROPER OPERATION OF TWO (2) VEHICLES OF THE DTE PE EVROS & THEIR ACCESSORY EQUIPMENT TO BE MAINTENANCED - REPAIRED
6Sep.MARKET RESEARCH ANNOUNCEMENT FOR THE FULL MAINTENANCE, DISASSEMBLY & TECHNICALLY PROPER OPERATION OF THE FIVE (5) VEHICLES OF THE DTE PE EVROS & THEIR ACCESSORY EQUIPMENT TO BE MAINTENANCED - REPAIRED